希望对你有帮助 the project of the annual output of 100 tons of phosphate mixed packing project.the contents include: (1)production workshop (2)auxiliary production workshop (3)comprehensive office(including laboratory), (4)machine room (5)spare parts (6)raw material with (7),... 20210311
from the concept of the governance structure of china l**ted companies, th** article analyses the current situation of the governance structure of china l**ted companies, and d**sects the ex**ting pr...
没有使用翻译软件,你看看,started from the stable operation and healthy development of gem,th** article analyzes the ex**ting r**ks and uncertainty of gem in china,concluding the primary r**k assessment in gem,d**...
3.2 the internal problems of the banking system 3.2.1 system of a lack of technical support technical support system in the absence of major technical support and two aspects of div**ion of labor. fir...
1.be out of stock2.galvanization3the price above ** cost tax-included price of rmb,not including fare and packing charges.4minimum quantity of an order5kirksite希望能帮上你!!
1. problem of excess production capacity can not be ignored. 2005 production capacity of china's automotive industry has a surplus of 2 million, to build capacity in the 2.2 million, are in the pi...